Years after the start of construction attention points need to know

After the Spring Festival, everything is on the right track. For the home improvement industry, the issue of resuming work after the year attracts much attention. First, the installation process is required to check the construction site, and problems are repaired in time. After various problems are resolved, it is possible to start the year. After the official construction. Then what problems do you have to pay attention to after construction? Let's follow Xiaobian together to understand it.

First, ensure that the construction works well after the first year

The decoration company's workers are generally not fixed and may change after the year before. Therefore, before the resumption of work, it is necessary to check whether the workers have been replaced, and whether the newly-replaced workers are clear about the construction process and the construction process, otherwise the problems of construction connection will easily arise. Therefore, if the decoration workers are changed after the resumption of work in the year, the industry will actively communicate with the decoration company and negotiate a settlement. The construction quality cannot be affected because of changes in the construction workers.

Second, start working in time to avoid the rainy season

Resumption of work should be delayed soon after the end of the year. If it is delayed, it will be followed by a humid rainy season. Therefore, if possible, finish the renovation project as soon as possible to avoid the impact of wet weather on the decoration.

Third, after the resumption of work in accordance with the Ministry

Due to the different construction schedules at each site, the priorities after resumption of work are also different. Let us take a closer look at the home improvement project that has progressed to different processes and how it should be carried out.

1. The carpentry has been completed

If the woodworking was completed before the end of the year, the focus of the post-holiday resumption is to check if there is any change in the carpentry work. If it is found that the problem of deformation and cracking needs to be repaired in time. If there is no problem, you can re-polish once and then paint the top; if the carpentry project has not been completed, then the resumption of work will need to ensure that the art of woodworking process before and after the Spring Festival convergence, to ensure the quality of decoration.

2, oil tiles have been completed

Before the Spring Festival, it is generally recommended that the bricklayers be finished. If the bricklayer can't finish it, he must also ensure that the walls or floors of the individual rooms are completely affixed. Otherwise, after the stoppage of work after the Spring Festival, the temperature and humidity will change, and the tiles may be empty.

3, the end of the stage

If the carpenter oil bricklayers are all finished, they will basically finish the work of laying floors, installing sanitary ware, and hardware. The importance of the project at this time is not low, and it cannot be taken lightly in the end. For example, when installing the floor, pay attention to reserve enough expansion joints; when installing sanitary ware, household appliances, and furniture, pay attention to protect the basic surface and products to prevent scratches or bumps.

Construction Bottoming Construction Acceptance Construction Contract Decoration Construction Knowledge

Polyurethane Insulation Pipeline

Polyurethane Insulation Pipeline, full name: high-density polyethylene plastic outer protective polyurethane foam prefabricated direct-buried thermal insulation pipe, which is composed of a working steel pipe for conveying the medium, a polyurethane insulation layer, and a polyethylene plastic outer protective pipe, which are combined outwards through the equipment in turn.

Heating Polyurethane Insulation Pipe,Polyurethane Thermal Insulation Pipeline,High Density Polyurethane Insulation Pipeline,Heating Polyurethane Thermal Insulation Pipe

Zhengzhou Ou Nuo Building Materials Co., Ltd. , https://www.yuounuo.com