Preparation and operation of ZW self-priming sewage pump before starting

[Asia Pump Network News] ZW-type self-priming sewage pump before starting what to do? Before the start of the preparation and operation of the work is necessary, you can check the status of the equipment, timely detection of problems and solve problems to ensure that the back of the work can be carried out smoothly. Next, we look at the ZW-type self-priming sewage pump before the start of the preparation and operation of the specific requirements. ZW-type self-priming sewage pump before the start of the preparation and operation 1, check the pump base, couplings, bearings and other connecting parts of the fastener is loose, loose if it should be tight. 2, rotating the coupling by hand if cassette or sound and so on. 3, open the pump above the water valve, add less than two-thirds of the volume of liquid storage tank, close the valve. After boot without recharging. 4, connected to the power trial about, from the motor side, clockwise turn. (Do not reverse) 5, boot work, observe the operation is normal, if there is an abnormal phenomenon, should find out the reasons to be excluded. The above is the ZW-type self-priming sewage pump before the start of the preparation and operation of the introduction, the operator during the preparation and operation of the work, you need special attention to ensure self-priming sewage pump can be smooth and safe operation. Further Reading: pump valve pipe fittings Exhibition 2016 Exhibition of Information Industry, Internet (Xiamen) Technology Co., Ltd. Author: Asian pumps Network Editor: Small L (QQ / micro-channel:) http://beng.liuti.cn/ (Service Hotline:)

Sliding Gate Hanger Track Guide Rail

Sliding Gate Hanger Track Guide Rail,Sliding Gate Guide Rail For HeavyDoor,Sliding Gate Guide Rail For GarageDoor,Sliding Gate Guide Rail For FactoryGate

Xiamen XMillion Co.,Ltd. , https://www.xmilliondoor.com