Precautions for using insulated gloves withstanding pressure tester
Insulated gloves withstanding pressure tester is designed and manufactured to test the safety and pressure resistance of insulated boots and gloves. It can effectively solve the unstandardized and unsafe test methods in the past, and greatly improves the scientificity and accuracy of the test data and is more reliable. To identify insulation aging of insulating boots and gloves, the insulating gloves pressure resistance meter ultimately ensures the safety of the electric construction personnel.
Insulation gloves pressure tester precautions
1. The test device during the test, the operator should be safe distance operation (less than 20KV per meter in air), power frequency voltage test bench must be grounded reliably, grounding resistance is less than 0.1Ω.
2. Insulation resistance should be tested before use. Its insulation resistance value should be greater than 2MΩ.
3. Before use, check whether the contacts of each electrical component are loose, whether the contact is good, and whether the protection systems can work normally.
4. Before use, all parts such as insulating struts, electrodes, electrode rods, and water tanks should be wiped with alcohol.
5. After the test is completed, the water should be discharged, and the parts should be dried with a cotton cloth. If it is not used for a long time, keep the sink, pole, and insulation brace in a dry and ventilated place.
6. Work and storage sites should have no serious influence on the insulation of gases, vapors, chemical dust, and other explosive and aggressive media.
7. Must be operated by professionals and strictly follow the operating procedures.
Insulation gloves pressure tester precautions
1. The test device during the test, the operator should be safe distance operation (less than 20KV per meter in air), power frequency voltage test bench must be grounded reliably, grounding resistance is less than 0.1Ω.
2. Insulation resistance should be tested before use. Its insulation resistance value should be greater than 2MΩ.
3. Before use, check whether the contacts of each electrical component are loose, whether the contact is good, and whether the protection systems can work normally.
4. Before use, all parts such as insulating struts, electrodes, electrode rods, and water tanks should be wiped with alcohol.
5. After the test is completed, the water should be discharged, and the parts should be dried with a cotton cloth. If it is not used for a long time, keep the sink, pole, and insulation brace in a dry and ventilated place.
6. Work and storage sites should have no serious influence on the insulation of gases, vapors, chemical dust, and other explosive and aggressive media.
7. Must be operated by professionals and strictly follow the operating procedures.
Steel Deep Drawing Parts,Deep Drawing Fabrication Oem,Custom Factory Sheet Metal,Sheet Metal Deep Drawing Fabrication
JIANGSU TONGDE INTERNATIONAL TRADE CO.LTD. , https://www.jstongdetrade.com