Pay attention to these eight steps of the toilet water leakage!

Bathroom seepage prevention and leakage has always been an eternal topic. Although many owners are concerned about this issue, they still have many problems. Therefore, we must pay more attention to the decoration so as to avoid future regrets. It will be too late to rework. Today Xiao Bian gave everyone a point about construction that needs attention, and hopes to help everyone!

First, level first

The floor of the bathroom should be flattened first. Before sticking the floor tiles in the bathroom, it must first be levelled with cement mortar and then treated with water. This will prevent leakage of the waterproof coating due to uneven thickness.

Second, waterproof coating is done

The joints should be brushed into place. The seams between the bathroom wall and the seam between the upper and lower water pipes and the ground are the most prone to problems. In construction, we must urge the workers to deal with these corners. All waterproof paint must be applied in place.

Third, waterproof treatment is very important

The wall treatment is also very important. In the general bathroom waterproofing treatment, a waterproof coating of about 160 to 180 centimeters high is also needed on the wall to prevent the accumulation of water through the wall. However, if the wall of the bathroom is a non-load-bearing light wall, the entire wall should be covered with a waterproof coating. If you use a two-seater shower screen, the two walls that are associated with it must also be covered. If you use a bathtub, the wall next to the bathtub is also best coated. When there is a shower and there is no other waterproofing measure, the waterproof layer should be showered so that it can spray to all parts.

Fourth, waterproof test must be done well

The Importance of Waterproofing Test It is not necessary for me to say it. After the construction of the bathroom is completed, all the water in the bathroom will be blocked and a 30 cm high “can” will be built in the doorway. Then 25 centimeters of water will be poured into the bathroom. After 24 hours, check the surrounding wall and floor for any leakage. This 24-hour waterproof test is the key to ensuring the quality of the bathroom waterproofing project and must be done. Otherwise, just wait and cry!

Fifth, the protection of the waterproof layer is very important

Everyone thinks that the waterproof layer is good for everything. Nowadays, bathroom renovations are generally affixed with wall tiles. Many decoration companies use waterproof walls and floors to paint together, but they are aware of the protection of the waterproof layer when sticking to the wall. Not enough, the waterproof layer on the ground has been destroyed and not repaired in time, causing the toilet leaking and seepage. Therefore, we must allow workers to timely repair damaged areas in time, so as to avoid leakage or seepage in the future. Otherwise, no matter how good the waterproof is, it is useless!

Sixth, keep the sewers open at all times

All sewers in the bathroom, including floor drains and plumbing fixtures of sanitary ware, should be kept clear and leak-proof. This will fundamentally avoid leakage and water seepage in the bathroom and avoid the “flood seven army” tragedy.

Seventh, decoration treatment prevention

After the water and wet parts of kitchens, bathrooms, etc. are renovated and finished, the elevation of the ground should be lower than the elevation of the hall or the corridor ground. The kitchen and bathroom doors should be installed with stones that are not afraid of water. Waterproof treatment should be done at the roots to prevent seepage of water from the door opening to the living room.

Eighth, special attention should be paid to the barriers between toilets and kitchen walkways.

Before the installation of the threshold, it is necessary to use cement to stir and fill the door and door after drying, so that the daily cleaning of the toilet and kitchen can effectively block and separate the flowing water, effectively achieving the waterproof and leakproof function. .

Tips: More practical decoration knowledge, real scene with the shoot, please pay attention to the palm of this site (micro signal: mall_jia).

Bathroom renovation construction knowledge

Rail Fastening System

Rail Fastening System,Fastening For Urban Transit,W14 Rail Fastening,E20 Rail Fastening

TAICANG ZHONGBO RAILWAY FASTENING CO., LTD. , https://www.railfastener.com