How to make a waterproof decoration do not be taken lightly

Home waterproofing, prevention is better than make up. Waterproof, initiative in the hands of the owners, can choose to decide the strength of waterproof, waterproof effect is good or bad. Good waterproof can eliminate the owner's leakage of water, so that we can rest assured that comfortable with the water, really put an end to the house's leak crisis. Here we will take a look at how to do a waterproof decoration.

How to make a waterproof decoration

1, do waterproof time

Home renovation, hydropower reform first, after the completion of hydropower reform, waterproofing will be done immediately. It should be noted that waterproofing should be done as much as possible in the structural base.

2, the main part of the waterproof

The floor and wall of the bathroom, the floor and wall of the kitchen and balcony, all floors and walls of the first floor house, the floor of the basement and all the walls should be treated with water and moisture proof. In addition, when the cavity grooves, pipes, or floor drains in the cavity pass through the floor, the surrounding wall of the hole needs to be waterproof.

3, waterproof area calculation

Waterproof area of ​​the Toilet room (m2) = (ground circumference of the toilet room - width of the door) x 1.8m (high) + (floor area)

Waterproof area between kitchens (square meters) = (kitchen ground perimeter - width of door) x 0.3 meters (high) + (floor area)

Balcony waterproof area (square meters) = (balcony ground circumference - width of door) x 1.8 meters (high) + (floor area)

4, waterproof price

Practical and good waterproof materials, construction work with good workers, the market price of 60-100 yuan / square meters, accounting for about 1% of the total decoration costs.

5, how to choose waterproof material

The real environmental protection waterproof material should have a nationally recognized test report issued by the testing center, a product test report and a product certificate. The manufacturers will have relatively standardized pre-sales, in-sales and after-sales services when selling products, and some well-known brands Commitment to free repairs and extended water warranty periods.

6, waterproof precautions

a. Be sure not to damage the original waterproof layer during the hydropower reform

b. Can't paint waterproof materials in rainy days

c. must do waterproof inspection

What are the waterproof construction processes and standards?

1. Don't destroy the original waterproof layer The original waterproof layer is easily destroyed during the renovation. If it is not repaired in time, leakage will occur in the future and it will affect the neighbors. Therefore, during the renovation, it is necessary to pay attention to maintaining the waterproof layer. If you accidentally destroy it, repair it in real time so as not to leave hidden dangers.

2. Waterproofing on the wall When water is bathed, the water will splash on the adjacent wall. If there is no waterproof layer on the wall, the nearby wall and the corner wall will be susceptible to mildew. Therefore, waterproof the wall before you apply the wall tiles. In the ordinary waterproofing treatment, the wall surface is to be treated with a waterproof height of 30 cm. The non-load-bearing light body wall is to be waterproof for the entire wall, at least 1.8 meters high. The waterproof surface of the wall adjacent to the bathing position should also be 1.8 meters high. If a Bathtub is used, the height of the waterproof coating on the wall adjacent to the bathtub is higher than the upper edge of the bathtub.

3, before paving the floor to do waterproofing before doing waterproof, to clean the ground, it is best to use polymer waterproof slurry average smear, to be dry after 24 hours and then paving tiles. The seam between the wall and the ground and the joint between the upper and lower water pipelines are most likely to cause leakage problems. It is recommended to use a flexible waterproof coating. The coating should be applied in place.

4, waterproof acceptance After the completion of the waterproof project, seal the door and the water outlet, fill the floor in the bathroom to reach the designated water level, and make a mark, if there is no clear decline in the water within 24 hours, the roof of the house downstairs did not Leakage occurred, and waterproof passed. If the acceptance fails, the waterproofing project must be completely redone and the acceptance must be re-accepted.

What is the danger of not doing waterproofing?

The water is pervasive, and even if the concrete is relatively strong, there are many pores that are easily leaked by the water. For toilets, baths and kitchens, which are often exposed to water, if there is a leak in one place, it will often form a string of water inside the floor and seep into the downstairs, affecting the relations between the neighbors. Seriously, it may cause major property claims and laws. dispute. Second, if you make up for waterproofing, the cost will be 3-5 times that before you make a renovation.

Summary: The above is the content of the decoration that Xiaobian introduced to everyone to do the waterproof content, hopefully can help to everybody effectively, more information please pay attention to this website.

Decoration waterproof kitchen waterproof and waterproof bathroom cabinets and exterior walls waterproof rock wool board bathroom waterproof

Hot Tub Spa

Hot Tub Spa

Hot Tub Spa,jacuzzi hot tubs,hotspring hot tub,hot tub pool,in ground hot tub

Guangzhou Aijingsi Sanitary Products Co.,Ltd , https://www.infinityedgehottub.com