Decoration must see: waterway transformation process
Construction process
Modification reasons:
Create a personalized water environment based on the population and water use habits of each family. There are more tricks and each one is different. General methods:
1. Change the pipe from the pipe to the pipe and bury it in the pipe.
2, install hot water pipes. Households that use gas water heaters lead the pipelines to the bathroom; homes that use electric water heaters place water heaters in the bathroom and kitchen, and then pick up hot water pipes nearby. Note: The PPR pipe is divided into hot and cold water pipes, and the corresponding pipe wall and pressure resistance are different, and the hot water pipe pipe is thick.
3, change the position of the valve water meter, water pipe valve to change the low, - or even wrap up, which brings some hidden dangers in the future maintenance and work, it is recommended: the total water valve in a better open position. Such as the table, the pipe behind the valve to do low processing; washing machine to move the floor or faucet lead the balcony to wash the mop, watering; water meter high to change the low, --- that rely on the wall to save space, but after putting the cabinet is very Difficult to overhaul and view, the correct way is: by the cabinet, a low vertical wall installation.
4, install purification equipment. Reserve purification equipment branch interface until the end of the renovation, cabinets installed in place, please water purifiers, softener manufacturers come to install water purification equipment. It is generally installed in the space under the sink, so the kitchen partition where the sink is located should be large enough, such as 80 cm wide.
5. Change the heating pipe and move the radiator to the position where the furniture is conveniently placed, such as under the window sill.
6. Solar (hot water) transformation For the top-level households, reserve the pipeline interface required for installing solar water heaters.
The first step, on-site measurement and your discussion of the specific direction of the waterway
The second step, workers use on your wall
Water and electricity renovation Heating space Faucet Home renovation Gas water heater Decoration Partition partition Door partition Cabinet Family Kitchen cabinet door Kitchen cabinet door Toilet partition Toilet door