The season decoration is focused on hydropower, waterproof and woodwork
Autumn is the peak season for home improvement, and it takes a lot of time to work. It is very common to catch up with workers. The insiders suggest that the renovation should be supervised for important projects, and the construction site should be more inspected, especially regarding the details of easy to cut corners such as hydropower, waterproofing, and woodwork, and strictly guard against it, beware of the construction quality affected by workers.
â– Engineering Supervision
Hydropower
Issue detailed trend chart
Hydropower projects are the most frequently problematic parts in the process of use after renovation. Therefore, consumers must communicate with designers or decoration companies before and after waterway and circuit decoration. Before the renovation, the designer or the decoration company should make a water potential trend and point distribution map, and must plan and rebuild the whole process. After the decoration is completed, there may be changes in the paintings on the map. It is necessary for the other party to have a more detailed circuit orientation and current trend map for future maintenance.
Tip: Because of the dryness in autumn, on-site construction safety has become the focus of attention at this time, including the water and electricity used in the process of water circuit connection and after the connection is completed. The construction workers of the regular company are not allowed to live on the construction site, nor are they allowed to cook, boil water, smoke, etc. on the spot. The possibility of such problems in ordinary houses is small, and villa decoration is more likely to have similar problems.
Consumers should always go to the scene to see, while looking at the construction process, also look at the bathroom and kitchen, how the health situation inside, whether the site material is placed neatly, whether the construction waste is cleaned daily. If a company's construction site management is in place, neat and orderly, construction quality and safety can be more assured.
waterproof
Guarantee the time of the waterproof test
There are many engineering details that need to be paid attention to during the renovation of the peak season. The most overlooked part of the workers because of the workers' work is waterproofing, that is, the closed water test of the bathroom. The water shut-off test needs to be carried out after applying the waterproof coating for the last time for 12 hours, after the waterproof coating is firmly combined with the original structure of the base layer.
During the test, it is required to seal the door and the drain, fill the bathroom floor with water, reach a height of 3-5 cm, and make a mark. If there is no obvious drop in the water surface within 24 hours, especially the roof of the downstairs household does not seep. Leakage and waterproofing are acceptable. Conditional families are advised to do a 48-hour water-tight test. If the acceptance is unqualified, the whole must be redone waterproof, and then re-inspected after completion.
Tip: There are also many precautions for the application of waterproof coating. First, the cement should be used to level the ground before painting. Otherwise, the ground will be uneven. The painted waterproof coating will leak due to uneven thickness. Second, coating The brush should be in place, the wall must reach the agreed height, the corner of the wall and the joint between the wall and the ground must not leave a gap.
Woodwork
Guaranteed moisture content to enhance on-site protection
At present, the wood products in the home decoration are mostly processed by the factory and then transported to the construction site. The components actually applied on site are less and less, but the moisture content and installation process of the wood products need to be kept in mind. After the plate products purchased by the consumers are transported to the construction site, they need to be placed for a few days, so that the moisture content of the plates can be installed close to the indoor level. Do not install immediately because of an emergency, otherwise the temperature difference will easily lead to cracking, bending and deformation of the product.
When consumers visit the site, in addition to grasping the installation time, they must also strengthen the on-site construction of wood products. Installed wood products need to be coated with a layer of paint. This layer of paint not only protects the wood products, but also protects the moisture and maintains the normal moisture content of the wood.
Tip: The temperature changes frequently in autumn, and wood products shrink due to water volatilization, and even cracking occurs. In case of such a situation, it is necessary to carry out repairs. It is recommended that in the spring of the coming year, the temperature difference between the four seasons will change significantly, and when the problem of cracking and deformation will no longer develop, a one-time repair will be carried out, which will enhance the stability of the wood products.
â– Tips
Reasonable control of time
An ordinary residence of 80-100 square meters, the construction period of real construction should be about two months. In September and October, the renovation began. In November and December, it was installed, just in time for the winter, which brought a lot of inconvenience to the window.
The so-called spring and autumn seasons are suitable for decoration. It refers to the spring and autumn seasons because of the dry weather and occasional winds. The window smell may be about three times faster than other times. Therefore, it is recommended that consumers can push the time forward and decorate as soon as possible. In the autumn season, just as the oil is finished, the furniture will enter the market, and it will be more reasonable to arrange the time.
It is not recommended to directly find the construction team
Many consumers have seen the decoration of neighbors before the renovation, and feel that the workers are not bad. Just as the foreman also advises consumers to consider the process of saving money and not looking for the company's process, directly looking for construction team construction. According to industry insiders, this situation is particularly prone to problems.
First, because the price has not passed the company's quotation system, the company does not enjoy the preferential benefits that the company originally gave to consumers; second, the construction team's employment situation in a company is unstable, resulting in no guarantee for consumers' after-sales service. When people deal with it, the result is that the second renovation is ahead of schedule, and consumers have to spend more money.
Large companies have to write down the contract details
Even if you choose a big-name home improvement company, it is best to do your homework before signing a contract. When signing a decoration contract, you must be clear. The decoration contract is a binding certificate for the quality of the home improvement, and it is also a guarantee for avoiding home decoration disputes. Therefore, when signing the contract, the terms of the contract should be carefully checked. Once the problem is found, the decoration company should be consulted in time to ensure that the rights and interests are not damaged.
In the decoration contract, in addition to the requirements for the decoration, it will also explain the accidental factors that are difficult to avoid during the decoration process. For example, the safety problems at the construction site and the physical condition of the construction personnel should also be refined one by one in the contract, so that the responsibilities of both parties are more clearly defined.
Small company convertible payment method
If the budget is not enough, to find a construction team or a small company with a lower price, you can guarantee the service process of the other party through the control of the payment method. According to the model contract for family decoration in Beijing, the decoration should be paid 55% first, then 40%, and 5%. But for these companies, it is recommended to pay in the form of 3:3:3:1.
The specific payment method is to pay 30% when signing the contract or materials, and 30% for the water and electricity inspection; when the wall and floor tiles are finished, the paint will be paid 30%; finally, the completion acceptance will be completed, and then 10% will be paid. This kind of payment method is more practical, and there are many small companies that are acceptable at present, but some consumers still don't know much about it.
Personally select construction workers
Whether it is to choose a large company, a small company or a construction team, it is especially important to select good construction workers. First, the foreman, the consumer must communicate well with the foreman to facilitate future cooperation; the second is the construction workers, consumers can go to other construction sites to see, for which workers work well, which do not do well. Count, then ask yourself to pick the workers who work. Due to the busy construction season, the construction workers are busy, and the construction workers are generally scarce. Some construction workers may be delayed for a few days because they are more popular. Consumers should try to understand.
Decoration Guide: An Xiaochun, Director of Beijing Jinchao Design & Decoration Co., Ltd.; Li Jianmin, Manager of Beijing Tiangu Weiye Decoration Engineering Supervision Co., Ltd.
Beijing News reporter Li Ling
Grinding head is a kind of small handle grinding tools, used in electric mills, hanging mills, hand electric drills. There are many kinds of diamond grinding head, ceramic grinding head, rubber grinding head, diamond grinding head, emery cloth grinding head.
Ceramic grinding head: grain size sand (generally brown corundum, white corundum, chrome corundum, silicon carbide) sintered by ceramic binder, with a metal handle in the center. Mainly grinding all kinds of metal, for grinding the inner wall of aperture, mold correction. Rubber grinding head: fine sand is synthesized by rubber binder for the polishing of mould
Diamond grinding head: A kind of stone material, ceramic materials and other non-metallic materials of grinding tools, especially involving a with diamond alloy grinding tools for grinding body, it includes substrate and a mill body, in which several mill body clearance to fixed to the substrate, the grinding surface of the grinding head grinding body also set a clearance, among them, the substrate is best by a certain toughness of adhesive materials, The grinding body is preferably made of diamond alloy material. The utility model has the advantages of high grinding performance, simple manufacturing and low cost, high grinding quality and being suitable for large-scale grinding
Grinding Heads,Cbn Sharpening Stone,Brazing Diamond Drilling Tool,Flexible Polyurethane Grinding Head
Henan Jinlun Superhard Material Co., Ltd , https://www.jinlunsuperhard.com