We will encounter the use of plaster line during the decoration, then everyone knows that the plaster line formula is what? The plaster line formula can be said to be confidential, but the plaster line formula is related to our decoration problems, so the decoration home network The Xiaobian is now to share with you what the gypsum line formula is. The introduction of the gypsum line formula hopes to help you, as well as the installation points of the plaster line formula.
First, plaster line formula skills
1. First, apply a layer of release agent in the plaster line model, then cast a layer of gypsum slurry into the model, add the glass fiber wire in the third step, (glass fiber wire accounts for 3% of the plaster line) and in the plaster line. A section of plastic rope is added for drying, and finally the gypsum slurry is poured again and the plaster line is compacted to extrude the bubbles in the model. After waiting for about 25 minutes, clean the corners of the plaster line and release it to the drying room for drying.
2, gypsum powder to adjust the appropriate spoon, the size of the spoon should be proportional to the width and thickness of the production of gypsum lines, the wider the thicker the line requires more gypsum powder, the larger the choice of spoon. Add water to the spoon and sprinkle with the gypsum powder.
3. Evenly apply the adjusted gypsum slurry into the plaster line mold until the gypsum slurry completely covers the front surface of the whole mold, the thickness reaches 5mm or more, then add fiberglass or mesh cloth, and add a firm thin rope at one end. It is then covered with a layer of gypsum slurry and then scraped with a special mold scraper. Here we emphasize that the thickness must be up to standard, do not cut corners, not worth the loss, and eventually lead to easy breakage or deformation when demolding.
Second, plaster line formula installation points
1. When the grassroots treatment is in place, when is the plaster line most suitable? Only the grassroots level is up to standard, which is an important prerequisite for ensuring the construction of the plaster line. How to achieve the standard? First, the wall must be checked by the ruler, and then the top of the wall. The putty has been scraped 2 times, and the visual surface is flat without protruding or concave parts. Only by doing this can the early quality of the later plaster line construction be guaranteed.
2, gypsum line construction sequence: construction first front, starting from the front, only to do so can ensure that the front joints are less, put less than half of this type into the inconspicuous parts.
Third, plaster line formula considerations
1. The suitable construction temperature is 5 to 40 °C. If the wall is too dry or the water is too fast before construction, it is necessary to wet the wall in advance to prevent the blister caused by the abnormal material on the bottom of the wall.
2. If the wall material or slurry is too thin, some small bubbles will be generated on the wall surface. It takes 10 minutes to stir the slurry once. After scraping the first putty, if there is still a small bubble phenomenon, it is necessary to remove the small bubble and scrape it a second time, which does not affect the construction quality.
What is the plaster line formula, the main points after the installation of the plaster line formula, and what are the precautions for our plaster line formula, friends have already learned under the introduction of Xiaobian, then we hope that the knowledge of these plaster line formulas will be Everyone is helpful, there is a lot of decoration information on the decoration home network, and everyone continues to click on the attention.
Solar Flood Light,LED Solar Flood Lights,Solar Powered Flood Lights,Solar LED Flood Lights
Ningbo Deamak Star Intelligent Technology Co., Ltd , https://www.deamakstar.com