Attention during the construction of hydropower

Nowadays, material management in the building material market is not standardized. When purchasing electricity and water lines such as wires, switches, lamps, and water supply pipes, do not plan to purchase cheaper products. Buy regular factory products, and carefully check production licenses, business licenses, and test reports. 3C certification and other information is complete, and to open an official invoice. In the hydropower construction process, the following points are mainly noted:

1. Do not damage the original wire piping or plumbing piping when drilling holes. When the electrical conduit is laid, it is necessary to thread the conduit. Do not bury the wire directly on the ground or in the wall. This is not only unsafe, but it cannot be repaired once it is damaged. After the plumbing pipe is applied, the plumbing pipe must be pressure tested. After the pipe is qualified, the next process is performed to prevent the pipe from leaking and causing damage.

2, the kitchen and bathroom, etc. need to do waterproof parts, after the completion of the water must be closed water test, after passing qualifying.

3, wire connectors must be tinned, kitchen and bathroom fittings recommended to do waterproofing, joints can be used high-pressure self-adhesive tape and black tape for dressing.

4. Lamps with a weight of more than 3 kilograms must be fixed on bolts or embedded hooks. It is forbidden to use wooden wedges to fix them; the metal shell of lamps with installation height less than 2.4 meters must be protected grounded, and the toilet must use waterproof sockets.

Lighting brand switch socket building materials market bathroom waterproof bathroom leak

Measuring Tape

Measuring Tape,Steel Measuring Tape,Leather Measuring Tape,Mini Measuring Tapes

Shangqiu Jinda Tools Co.,Ltd , https://www.jindameasur.com