All is dry goods! A decoration owner's advice
In the decoration, we are the ones who are the most trusted. Those who came from the decoration of Xiaobai all the way through. The experiences that are summed up through their own experiences and lessons are the best textbooks for the newly renovated people. Today we interviewed a newly renovated owner and listened to his valuable experience!
1, on the choice of decoration company
Renovation companies can have more than about a few, offer more comparisons, it's best to look for quotes that can take away the kind of look slowly, go back to each serious comparison to find the difference. It is important to know which walls in your home you want to knock on and which do not knock on; make your own measurements, the area of ​​each room, the perimeter, the height of the windows, and avoid quoting low prices or high prices or price inconsistencies. When measuring, pay attention to the location of the kitchen and bath pipeline, avoid designing but be limited by the pipeline. Many additions in the later period may be due to pipelines. For example, cabinets with cabinets specially designed for water pipes are expensive.
2, to do before the decoration
Things to prepare before the renovation, if you want to close the window, contact the window merchant to measure it earlier (before the decoration team can determine), the window production cycle is 10-15 days, and the window must be before the tile. Some can be advanced in advance Find a few to measure quotes and avoid signing up too expensively because of anxieties. If it is too late to install windows, you can install the window frame first and then install the glass (this means that your family should be streaking for a few days, and it will be a tragedy if it rains.
3, on the tiles
In addition to finding the cabinet manufacturers to measure in advance, the most important finished product is tiles. Because the finished product, the tiles are installed first. Cabinets, doors, floors, and sanitary ware are all behind. So during the preparation period, everyone can include the tiles in the plan that was prepared in advance. Just look at the brand, style, and price. The specific area can only be known if the tiler goes in with detailed and accurate measurements, and calculates what you are wasting or losing. When you buy it temporarily, you will lose a lot of time for picking up, or delay the construction period.
4ã€Timing note
When tiling, you need to embed the shower enclosure's weather strip, so the shower room should also look in advance, according to their needs to choose a round, rectangular, diamond-shaped, etc., whether to send water (black, white or other colours).
5. Hydropower stage
Hydroelectricity is the most likely place to generate additional items, because hydropower is calculated on a real basis, and it is necessary to pay attention to the unit of measurement. For example, the slotting fee is calculated on a per room basis or on the basis of the specific number of slots. The water pipe is generally a set. How much money. The price of electricity wire Shenma see clearly. The hydropower phase must take pictures of themselves, first, after the convenience of later hole installation of various things; second is to live in, if necessary to maintain the water and electricity lines can be used as a reference; do not forget The decoration company asked for a copy of hydropower to CD-ROM.
6, socket
Buy the socket must choose 2 holes and 3 holes a little larger, or later inserted 3 holes, 2 holes can not be inserted on the waste; the bathroom and the place where the water contacts the best can buy the kind of waterproof cover The air-conditioning socket does not need to buy a switch, because the air-conditioning is generally independent all the way, and no one will specifically climb up to press the switch, my family bought 3 supervised said that wasted...
7, toilet
Toilet, must pay attention to the pit distance. The general pit distance is 40 and 30. Before I especially told businesses that my home was a 40-foot hole, the result was sent wrong. After the toilet is delivered, he must personally open the package and check it. I only looked at the packaging and didn't look at the inside. The result was changed from the pit to the replacement and it was very troublesome.
8, bargaining
Buy things must try to point more things, you can save a lot of money, such as the floor required to give a kick line, send more groups of buckles, my house buckle is not enough, plus five groups of 150 oceans; basin what to ask clearly Faucet, water, etc. can not be sent; sink to see the angle valve, drain basket, cutting board can not send; toilet to see the flange, angle valve, etc. can not send ...
Decoration construction knowledge construction bottom construction acceptance
Manual Pallet Stacker,Hydraulic Manual Stacker,Stacker Manual,Hand Stacker Electric
Guangdong Gongyou Lift Slings Machinery CO.,LTD , https://www.workmatehoist.com