Supervising decoration considerations
Supervising decoration notices frequently spend thousands of dollars to decorate the room. People are very concerned about the quality of the decoration. The quality of the room is directly related to the effect of the room's function and the degree of comfort and warmth of the room. Therefore, the decoration quality assurance is the family. Important prerequisites for renovation. The following describes some of the work and requirements of the renovation project, its standards have basically reached the level of high-level, if you are not familiar with the decoration of the house, you can refer to the following criteria, inspection and supervision of home decoration to ensure that a number of workmanship quality.
Carpentry production 1 production of wooden doors and windows jackets, wooden skirts, baseboards should have a wood dragon skeleton or blockboard backing. 2 The skeleton of the dragon should be fixed with a hammer or an impact drill to tighten the wooden wedge on the wall and then level it. 3 The veneer layer requires a uniform and consistent texture of the wood grain, and the joints must be handled strictly. 4 Use latex paint or adhesive to stick the surface material to the wooden keel on both sides, and dry it to pressure in 5 to 10 minutes, and use a wooden block to knock it out. 5 Use nails or pneumatic nails to nail the surface layer. The nail head should be embedded below the surface layer. 6 The angle of the external wall is combined with a 45-degree angle. The angle of the two-way planer is not allowed to see the appearance of the sheet.
The surface color of the wood decoration paint 1 is correct, uniform, and smooth and moderate, without teardrops, over-thickness, bottoms, blisters, etc. 2 Paint borders are straight and tidy, not out of bounds. 3 The gray wall did not see the protruding block and the corner was flat. The interface between the board and the board, board and wall must be affixed with a fiber tape to make it greasy. 4 Try not to paint in wet weather to prevent “sweat†quit.
After laying wallpaper 1 shovel the wall first brush waterproof oil again, to polish 2 times, each time with 100 emery cloth to polish, have gaps to be repaired immediately, to the naked eye can not see the convex wall concave position, the hand touch no big sudden big concave prevail . 2 The wallpaper should be precise, flat, and free from blistering. 3 With a sharp blade cut, there should be no tearing of the paper edge. 4 wallpaper glue spill immediately wipe clean with a clean towel.
Flour wall decoration 1 At least the walls must be scraped twice. The putty is made of talcum powder and made of good quality 107 glue or diluted latex. 2 After each putty, grind it with an emery cloth 80. 3 Check the smoothness of the whitewashed wall, use a straight wooden or aluminum material about 1.5 meters long, erect the wall surface, and observe the connection between the straight edge of the wood or aluminum material and the wall surface from the side. The gap is too large, indicating that the unevenness of the wall is convex and concave; if the gap is small, it is a dark line, indicating that the wall surface is flat and in line with the standard.
Lay the water pipe 1 and place the pipe at the nearest distance. The minimum interface is the standard. The pipe body should be straight and tidy and bent and folded as little as possible. 2 All indoor use galvanized pipe, hot water with plastic hose, PVC pipe for water, the interface should be wrapped with waterproof tape to prevent leakage. 3 Install the basin and the toilet to the level and the corners. 4 Install faucet or pipe fittings, use cloth tools, do not get flower faucets and accessories, and do not use the hammer to directly and strongly strike. 5 Floor drains should be installed in the kitchens and toilets to ensure that no water accumulates on the ground. 6 The water must be tested after installation, without seepage, leakage or dripping.
Paving tile Tile â‘ to insert flat surface, the angle to be accurate, to the interface of the line. 2 The tiles should be immersed in water for half a day before use. 3 The floor of the kitchen and toilet should have a proper slope and no water can accumulate. 4 After the white tile cement is cleaned with white rattan brush, do not leave cement on the tile surface. 5 When the bricks are finished, cover them with cardboard, etc., and walk at least 24 hours later.
Laying the floor 1 The wood floor floor is to be hit with a dragon skeleton, the size of which matches the floor specification. 2 Polishing the floor should be smooth, no pits or scratches, and corners should be ground with an angle grinder. 3 floor wax at least three times oil. 4 new maple wood floor to use 9 to 12 mm plywood as the bottom lining, the bottom of the shop to be covered with oil-proof paper or plastic film and other objects to prevent the flooding of the ground. 5 Lay the composite floor to first treat the concrete floor, and level or fill the large depressions to ensure smooth laying.
Carpentry production 1 production of wooden doors and windows jackets, wooden skirts, baseboards should have a wood dragon skeleton or blockboard backing. 2 The skeleton of the dragon should be fixed with a hammer or an impact drill to tighten the wooden wedge on the wall and then level it. 3 The veneer layer requires a uniform and consistent texture of the wood grain, and the joints must be handled strictly. 4 Use latex paint or adhesive to stick the surface material to the wooden keel on both sides, and dry it to pressure in 5 to 10 minutes, and use a wooden block to knock it out. 5 Use nails or pneumatic nails to nail the surface layer. The nail head should be embedded below the surface layer. 6 The angle of the external wall is combined with a 45-degree angle. The angle of the two-way planer is not allowed to see the appearance of the sheet.
The surface color of the wood decoration paint 1 is correct, uniform, and smooth and moderate, without teardrops, over-thickness, bottoms, blisters, etc. 2 Paint borders are straight and tidy, not out of bounds. 3 The gray wall did not see the protruding block and the corner was flat. The interface between the board and the board, board and wall must be affixed with a fiber tape to make it greasy. 4 Try not to paint in wet weather to prevent “sweat†quit.
After laying wallpaper 1 shovel the wall first brush waterproof oil again, to polish 2 times, each time with 100 emery cloth to polish, have gaps to be repaired immediately, to the naked eye can not see the convex wall concave position, the hand touch no big sudden big concave prevail . 2 The wallpaper should be precise, flat, and free from blistering. 3 With a sharp blade cut, there should be no tearing of the paper edge. 4 wallpaper glue spill immediately wipe clean with a clean towel.
Flour wall decoration 1 At least the walls must be scraped twice. The putty is made of talcum powder and made of good quality 107 glue or diluted latex. 2 After each putty, grind it with an emery cloth 80. 3 Check the smoothness of the whitewashed wall, use a straight wooden or aluminum material about 1.5 meters long, erect the wall surface, and observe the connection between the straight edge of the wood or aluminum material and the wall surface from the side. The gap is too large, indicating that the unevenness of the wall is convex and concave; if the gap is small, it is a dark line, indicating that the wall surface is flat and in line with the standard.
Lay the water pipe 1 and place the pipe at the nearest distance. The minimum interface is the standard. The pipe body should be straight and tidy and bent and folded as little as possible. 2 All indoor use galvanized pipe, hot water with plastic hose, PVC pipe for water, the interface should be wrapped with waterproof tape to prevent leakage. 3 Install the basin and the toilet to the level and the corners. 4 Install faucet or pipe fittings, use cloth tools, do not get flower faucets and accessories, and do not use the hammer to directly and strongly strike. 5 Floor drains should be installed in the kitchens and toilets to ensure that no water accumulates on the ground. 6 The water must be tested after installation, without seepage, leakage or dripping.
Paving tile Tile â‘ to insert flat surface, the angle to be accurate, to the interface of the line. 2 The tiles should be immersed in water for half a day before use. 3 The floor of the kitchen and toilet should have a proper slope and no water can accumulate. 4 After the white tile cement is cleaned with white rattan brush, do not leave cement on the tile surface. 5 When the bricks are finished, cover them with cardboard, etc., and walk at least 24 hours later.
Laying the floor 1 The wood floor floor is to be hit with a dragon skeleton, the size of which matches the floor specification. 2 Polishing the floor should be smooth, no pits or scratches, and corners should be ground with an angle grinder. 3 floor wax at least three times oil. 4 new maple wood floor to use 9 to 12 mm plywood as the bottom lining, the bottom of the shop to be covered with oil-proof paper or plastic film and other objects to prevent the flooding of the ground. 5 Lay the composite floor to first treat the concrete floor, and level or fill the large depressions to ensure smooth laying.
Lacquer cement Decorating home Latex paint Flooring tiles Home wallpaper Toilet doors Exterior wall tiles Tile adhesive tiles Tiles Specifications Kitchen tiles Floor tiles Renovation Furnishing
Machinery Parts,Construction Machine Parts,Construction Machinery Parts,Wheel Loader Spare Parts
JINING SHANTE SONGZHENG CONSTRUCTION MACHINERY CO.LTD , https://www.sdkomatsuloaderparts.com