New house acceptance six key standards
Moving into a new home is not a big deal. There are many nuances that need to be taken care of. If you want to move in easily, you must also practice a variety of "Kung Fu."
Winter acceptance is not too different from other seasons, so don't worry too much. In addition to choosing a formal decoration company for protection, Huang Shiming, manager of the engineering department of Dongyi Risheng Decoration Co., pointed out that water circuits, wall surfaces, ceilings, paints, wood and wood flooring have become the key projects for acceptance. There is a clear provision that can be obtained from the decoration company. At the same time, the owner has mastered these tips and can make acceptance more prepared and easy to deal with.
Water supply and drainage pipeline acceptance
1. The arrangement of pipelines should meet the design requirements. The installation of pipelines should be fixed firmly without looseness. The faucet and valves should be installed smoothly, with flexible opening, smooth water flow, and normal operation of the water meter. Acceptance by visual inspection and feel.
2. There should be no leakage at the joints between pipelines and appliances, pipelines and pipelines. Using the method of passing water, visually and feel the method to check for leakage.
3, the installation of water pipes shall not be close to the power supply, and the spacing between the water pipes and gas pipes shall not be less than 50mm. Check with a steel tape measure.
Electrical acceptance
1. After the completion of the project, the owner shall provide the dimension drawing of the line going to the position and carry out the acceptance inspection one by one according to the above requirements. The concealed electrical line shall be concealed after the acceptance of the owner.
2. The position of the live wire and the neutral wire facing the power socket is the right flame left-zero, and the socket with the grounding hole should be the upper position of the ground wire socket, and the grounding should be reliable. The switch socket should be firmly installed. Visual inspection and manual methods are used to check and special tools for circuit testing are used to verify that the positions of the live, neutral and ground wires on the socket meet the requirements.
Tile mosaic acceptance
1. The wall-inlaid stickers should be firm, the surface is smooth and clean, and no leaks are posted wrongly; the gaps are evenly distributed around the periphery, and the brick surface has no cracks, falling angles, missing edges, etc., and can be accepted by visual inspection under natural light.
2, with a small hammer gently tap on the wall to see if there is emptying phenomenon.
Winter acceptance is not too different from other seasons, so don't worry too much. In addition to choosing a formal decoration company for protection, Huang Shiming, manager of the engineering department of Dongyi Risheng Decoration Co., pointed out that water circuits, wall surfaces, ceilings, paints, wood and wood flooring have become the key projects for acceptance. There is a clear provision that can be obtained from the decoration company. At the same time, the owner has mastered these tips and can make acceptance more prepared and easy to deal with.
Water supply and drainage pipeline acceptance
1. The arrangement of pipelines should meet the design requirements. The installation of pipelines should be fixed firmly without looseness. The faucet and valves should be installed smoothly, with flexible opening, smooth water flow, and normal operation of the water meter. Acceptance by visual inspection and feel.
2. There should be no leakage at the joints between pipelines and appliances, pipelines and pipelines. Using the method of passing water, visually and feel the method to check for leakage.
3, the installation of water pipes shall not be close to the power supply, and the spacing between the water pipes and gas pipes shall not be less than 50mm. Check with a steel tape measure.
Electrical acceptance
1. After the completion of the project, the owner shall provide the dimension drawing of the line going to the position and carry out the acceptance inspection one by one according to the above requirements. The concealed electrical line shall be concealed after the acceptance of the owner.
2. The position of the live wire and the neutral wire facing the power socket is the right flame left-zero, and the socket with the grounding hole should be the upper position of the ground wire socket, and the grounding should be reliable. The switch socket should be firmly installed. Visual inspection and manual methods are used to check and special tools for circuit testing are used to verify that the positions of the live, neutral and ground wires on the socket meet the requirements.
Tile mosaic acceptance
1. The wall-inlaid stickers should be firm, the surface is smooth and clean, and no leaks are posted wrongly; the gaps are evenly distributed around the periphery, and the brick surface has no cracks, falling angles, missing edges, etc., and can be accepted by visual inspection under natural light.
2, with a small hammer gently tap on the wall to see if there is emptying phenomenon.
Entrance decoration villa design socket decoration decoration company switch decoration design floor tile floor tile
The installation of the countertop basin is easy, as long as the hole is opened on the countertop. There are a variety of sink edge designs for over-counter basin sink styles to choose from. It is necessary to ensure that the connection gap between the sink and the countertop is uniform, and there is no water seepage.
Topmount Sink,Top Mount Farmhouse Sink,Top Mount Stainless Steel Sink,Top Mounted Wash Basin
JIANGMEN MEIAO KITCHEN AND BATH CO.,LTD , https://www.jmmeiaogroup.com