Solid wood floor laying and installation notes
Runtai Decoration    Leiyang Decoration
First, the laying and installation of solid wood flooring
In the surface decoration construction, there are many problems in solid wood laying. Therefore, in the construction of solid wood floors, you must supervise the workers to operate according to the "six steps" of solid wood floor construction.
1. Before construction, prepare materials such as grille (keel), wooden floorboards, skirting board, waterproof paper and construction tools. Pay attention to the decorative materials must be selected after drying, anti-corrosion, pest control type and model, the smaller the color difference of the material the better. Before the laying of wooden floors, all indoor “wet operations†are required to be completed. The embedded parts shall be laid in place according to the design requirements. The degree of plaster drying shall be more than 80%, and the doors, windows and sub-glasses shall be installed and the horizontal elevation lines shall be used.
2. When laying the grille (wood keel), it should be closely combined with the ground embedded parts.
3, laying a grid grille, should pay attention to the degree of density, and whether the main grid is connected tightly and firmly.
4, carved ventilation slots, pay attention to the order, azimuth and direction of consistency.
5. Paving partitions (large core panels). Note that the partitions and wooden keels should be tightly and firmly bonded.
6. When paving the wooden floor, pay attention to the pavement in sequence. Floor blocks with patterns and patterns should be marked in advance. In the vertical angle between the edge of the wooden floor and the wall, about 10 mm expansion tank should be reserved to prevent the wooden floor from warping due to heat and moisture.
Second, the laying of solid wood flooring and installation precautions
1. Moisture protection—Be sure to prepare the ground moisture-proof treatment before installation. If necessary, use a damp-proof cloth to prevent moisture.
2. Wood Dragon - Wooden keel must be used to dry wood (moisture content is less than 16%) and keel special screws to fix the wood nail holding power is better, soft and hard. The installation must not be filled with cement or yellow sand. Because of the high moisture content of the cement, it will cause deformation and mildew on the wooden keel and solid wood floor.
3. Laying—When solid wood flooring is installed, a gap of about 1 cm shall be left around the walls to allow the wood flooring to be generated and naturally stretched in the air with relative humidity changes. If no gaps are left around, it will cause arch deformation of the wooden floor. . In addition, the use of water-based adhesives such as white glue is not allowed to stick to the floor, so the glue will cause the wooden floor to distort after reabsorbing moisture. Fixed solid wood flooring is usually used floor nails, and installed on the wooden keel at an angle.
4, other - solid wood flooring for wood products, the color texture are different, can not be completely consistent, so in addition to the factory according to a strict separation of packaging, the installation also need to be wooden floor color, texture, length and appropriate deployment and Take advantage of.
Flooring Considerations Nature Floor Decoration Cement Interior Decor Glass Decoration Glass Door
Gardening Tools,Scissors Pruner,Gardening Pruners Tools,Shears Branch Trimming Cutting Pruner
ChongQing Troya Hardware Manufacture Co., Ltd , https://www.troyahardware.com